When it comes to overhead cranes, safety is critical.

A load test is a literal testing of limits. Pushing a crane beyond it’s rated capacity under controlled conditions to expose any flaws or breaking points, so that any repairs can be done.

How It Works

When a crane is first designed, an engineer will decide what rate of deflection (bend) both the bridge and runways are safely able to bear dependent on the size, length and design of the crane.

Once installed, a technician will then load the crane to 125% of it’s rated safe working load capacity. (ex. if rated for 5 tons, a load of 6.25 tons will be applied). This is usually accomplished with the addition of rated steel test weights or in some cases, such as sizable port gantry’s, water weights are the convention.

While under the additional burden of weight, the bridge and runways will then be measured, using the proper equipment, to see if the amount of deflection in the steel falls within the safe parameters laid out by the original engineered design.

The crane will also be tested to see that all functions are working correctly. A complete check of hoisting, lowering, trolley travel, bridge travel, limit switches as well as locking and safety devices will be completed under the extra stress.

This also allows the technician to determine and verify any load limit switches to proper and safe settings.

Why It’s So Important

When steel is under pressure it can expose many hidden problems, such as damaged weld seams or frame segments. Many underlying concerns that could lead to issues, including catastrophic failures down the road, will be brought to light during a load test which can be rebuilt or repaired before the equipment is put into use.

 

 

 

For more information on Kristian’s load testing and preventative maintenance click here.

 

 

 

 

Miller Build with Blue Spring 2026 Is Here — New Rebates, New Gear & More Ways to Save in Canada

If you thought Build with Blue wrapped up in March… think again. You know the deal — we’re back with another round of HUGE savings on Miller welding equipment, running from April 1 to June 30, 2026. Miller Electric has officially launched their Spring Build with Blue...

Dixxon at Kristian: Built for Work. Styled for Life.

When it comes to workwear, most people settle for “good enough.” But anyone who’s slipped into a Dixxon flannel knows there’s nothing “good enough” about it — it’s built different. At Kristian Electric, we’ve added DIXXON to our shelves to give welders, crane techs,...

Miller Build with Blue Is Back for 2026 — And It’s Bigger, Smarter, and Built for Real‑World Welding

Alright, let’s be real for a second. Winter is usually the season where welding projects slow down, budgets tighten up, and everyone starts putting off equipment upgrades. That’s exactly why Miller Build with Blue exists — and Build with Blue 2026 is shaping up to be...